From Desing to Construction to Inauguration

in Just a Few Months

Permanent modular Medical Building

With more than 50 years of combined experience in design, planning, and manufacturing / construction of permanent prefabricated medical facilities (hospitals, clinics, dialysis centers, medical offices), Advanced Med Solutions and its affiliated companies are the one-stop solution for governments and private institutions around the world in search of fast, permanent, modern, and affordable medical buildings.

Installation and Assembly in 1 Day

With 95% of the facility built in a factory setting, at less than the average price in less than half the time, planning and designs can be ready in 30 days and all construction and certification in less than a year. All facilities meet all the regulatory U.S. codes of construction of medical facilities, and those of the State of Florida and California against natural threats. Available with Medical Equipment and Medical Supplies.

Services

Design & Manufacturing

Advanced Med Solutions and it’s affiliates employ the use of a revolutionary rapid hospital designing method and a precision hospital building construction systems which allows our hospital clients around the world to go from initial planning to fully certified ready to build plans in 30 days and to a licensed and functioning hospital in under a year. New emergency rooms, operating rooms, and patient room wings can be completed within as little as three months.

Our designs meet all U.S. and International construction codes for medical buildings. We can build as small as a 1,000 square feet (100 square meters) satellite outpatient clinic, to over 100,000 square feet (10.000 square meters) inpatient hospital with open heart surgery capacity.

Within days Advanced Med Solutions has the infrastructure to provide preliminary floor plans and an all-inclusive final price. Thirty days after preliminary plans approval, Advanced Med Solutions provides their clients with a full set of constructible, architectural and engineering plans. Once all plans are approved by the local authorities, construction of the facility may take from 3 months for a small facility, to 11 months for a facility with over 100 beds.

Turnkey Service -Worldwide
Advanced Med Solutions and its affiliates have the capacity to provide all turn key services needed from design, equipment, transportation, assembly, testing and start of operations of our facilities.
Management Solutions
Advanced Med Solutions and its affiliates can provide the necessary tools for complete management and control over all operations and administration of the facility, providing our clients with a post-construction solution for their goals.
Green Technology -- Leed Certification
As members of the US Green Building Council, our designs and engineering is focused on the conservation and best use of our natural resources and energy. We work closely with some of the best LEED certified specialists and can implement any elements to fit our clients’ goals and needs. At last, our facilities are made mostly of steel, which makes it practically recyclable.
Medical Equipment

At Advanced Med Solutions we provide planning, selection, and procurement of medical equipment, based on our clients required level of technology, program planning objectives, and budget. Our goal is to provide a cost effective solution, as we do with our medical facilities. We provide quality equipment in the latest models, both new and refurbished, from manufacturers like General Electric, Phillips, Hill Rom, Medtronics, Midmark, and many more.

All equipment is suit to fit the needs of our client’s geographical location, and when possible, we may be able to offer financing from our multiple sources.

This is what we do

Pre-Designed

Pre-Designed  to provide faster cost and operational efficient hospital layouts

Pre-Designed to meets U.S. Florida and California codes of construction and the highest U.S. and international standards of the healthcare industry

Pre-Designed to meet IBC (Int’l Building Code) & NFPA (National Fire Protection Association)

Updated periodically to meet the latest advances in medical procedures, equipment and construction materials.

Pre-Engineered for highest building quality, operation efficiency, and lower maintenance cost

Pre-Engineered to provide the cleanest internal environment for highest patient care volume.

Pre-Engineered to meet Florida and California codes for hurricane and seismic threaten areas

Pre-Engineered to Guarantee perfect integration of specialized plumbing, wiring, and HVAC dock works

Pre-Engineered

Pre-Engineered

Pre-Engineered for highest building quality, operation efficiency, and lower maintenance cost

Pre-Engineered to provide the cleanest internal environment for highest patient care volume.

Pre-Engineered to meet Florida and California codes for hurricane and seismic threaten areas

Pre-Engineered to Guarantee perfect integration of specialized plumbing, wiring, and HVAC dock works

Pre-Constructed

Pre-Constructed 95% in factory to guarantee the speediest construction while maintaining the upmost quality.

Pre-Constructed to guarantee the highest building quality, and performance regardless of Country of destination.

Pre-Constructed to guarantee accessibility to best construction materials, labor, and equipment.

Pre-Constructed to guarantee daily quality controls, and avoid cost overruns and weather related risks.

Pre-Constructed with reinforced steel, concrete, and high quality durable materials, building equipments and finishes to guarantee a durable facility

Pre-Priced contract to guarantee the buyer a fixed priced, free of  cost overruns

Pre-Priced to provide accurate financial planning for the acquisition and ongoing operation

Pre-Priced to avoid increases in construction material cost

Pre-Priced

Pre-Priced

Pre-Priced contract to guarantee the buyer a fixed priced, free of  cost overruns

Pre-Priced to provide accurate financial planning for the acquisition and ongoing operation

Pre-Priced to avoid increases in construction material cost

Pre-Schedule

Pre-Scheduled to provide accurate planning for operational structuring and contracting, medical staff training, and medical supplies delivery

Pre-Scheduled to guarantee a country’s master planning implementation

Advantages over traditional Construction

IN-FACTORY RAPID CONSTRUCTION VS TRADITIONAL CONSTRUCTION

LOCKED PRICE: Our average construction price is over 50% below the cost of construction of hospitals in the USA, and thanks to our in-house planning and design capabilities, we are able to provide a FINAL and ONLY price at the moment of contract versus the exposure to cost overruns that characterize the traditional construction method.

EXECUTION TIME: Our in-factory construction capabilities and method of manufacturing provides us with total execution from planning to inauguration in less than a year, versus the typical year or more in planning, and 2 to 3 years in construction if all is done according to an efficient plan.

SAVINGS: Due to our lower price, rapid construction, and one stop solution approach, clients benefit greatly from faster and higher cash flow, faster loan amortization, faster execution of other future expansion plans, clear plan vision and execution, and many more.

QUALITY: The in-factory construction capabilities allow a constant and rigorous plan of quality control in every stage of the process. Furthermore, the method of manufacturing provides for labor to specialize in their tasks by repeatedly performing the same tasks guaranteeing the highest standards and quality of products and finishes in the market

REGULATORY: Our facilities meet all U.S. and International codes of construction of hospitals providing our facilities with the same insurance costs as traditional construction, as well as making possible certification for Medicare and Medicaid.

STRENGTH & DURABILITY: Contrary to popular belief, a pre-manufactured facility is stronger and more durable due that its pre-manufactured structures and components are made to withstand transportation and the lifts by cranes for assembly.

Green Technology Implementation

N

Economic benefits

-Reduced operating costs (Energy & Water savings)

-Extended building’s life-cycle

-Creation of new markets for green products and services

-Improvement of occupant productivity

N

Environmental benefits

-Best use of natural resources

-Improved air and water quality

-Reduced waste streams

N

Social benefits

-Enhance occupant comfort and health

-Heighten aesthetic qualities

-Minimize strain on local infrastructure

-Improve overall quality of life

Lower Operating Cost

N

Efficient Hospital Design

-Eliminates construction of unnecessary areas

-Reduces personnel needed

-Reduces energy requirements

N

Efficient Hospital Construction

-Increases patient volume

-Reduces maintenance requirement

-Reduces energy and water consumption

Proven to meet Joint Commission International Accreditation.

Proven Track Record in over 50 locations across America.

Proven to meet US’s strongest State’s codes and standard

Proven to meet global standards for “green” building and sustainable operations.